Acclimation in six steps
If the flooring material being installed does not have specific acclimation and conditioning instructions, here are the steps to follow: Step 1: Make sure that the heating and air conditioning units are in operation at least five days before delivery of the flooring, during installation and after the flooring is installed. If it is not possible for permanent HVAC to be operating before, during and after installation, a temporary system that mimics normal living conditions...